Hollingsworth Bros were appointed by Hanson UK in late 2017 to construct a piled Mill Foundation. The main aim of the project was to increase the production of cement by constructing a new Mill at Hanson’s Padeswood site, with the ultimate goal of reinstating a pre-existing rail link to take product off site directly and avoiding wagon movements.
SEE MORE CaseStudy Hanson Mill Foundation
Hollingsworth Bros Case Studies
The Main Contract work includes the construction of a new build 420 place primary school and 26 nursery provision together with external hard and soft play areas, car park and drop off areas, and multi use hard play games area, reduction and retention of an existing pitch as a junior pitch and a new adult / community pitch.
AGL Pit/Ducting installation
Hollingsworth Bros Ltd were Contracted by Edward Dewhurst to undertake the Civil Engineering works associated with the installation of Aircraft Ground Lighting at Hawarden Airport. All of the works were carried out at night after the airport closes. All works were then reinstated before the runway opened again the following morning.
Drainage and Road Package – Anwyl Homes
Hollingsworth Bros Ltd was employed as Principle Contractor to carry out the Roads & Sewers to a new Anwyl Homes development in Holyhead. The Principle Contractor role was handed to Anwyl Homes when their residential development started in earnest.
WORKS 278 PENRHOS RETAIL PARK
The main aim of this project was to provide a new access road for the proposed Anwyl Homes development. Read more
Broetje Automation for AUK
Hollingsworth Brothers were recommended by the client – AUK to carry out the groundworks package for Broetje, with a number of successful projects completed in AUK over a number of years. Read more
TIP LANE/FFORDD ISA | PRESTATYN, NORTH WALES
The main aim for this project was to replace the existing single lane tarmac track/road with a new road constructed to full highway specification, complete with cycle path linking all local cycle routes. Read more
278 WORKS | PENRHOS RETAIL PARK, HOLYHEAD
The main aim of this project was to provide a new improved access road for the proposed Morrisons Supermarket and surrounding retail stores. Read More
ELECTROIMPACT, PORT & STARBOARD PLINTHS | AUK, BROUGHTON
The production, delivery and installation of the plinths essential to the manufacture of the new A350 XWB aircraft. Read more
NORTH FACTORY BOULEVARD ROADS | AUK, BROUGHTON
The project required the existing Boulevard road be replaced with a new road construction that in part would be able to cater for the new 100 ton A350 XWB wing loader. Read more
PUMP STATION NUMBER 2 | AUK, BROUGHTON
The AUK Site 2 required a Storm Water Pumping Station to control flows of up to 500 l/s. Read more
TAXIWAY CHARLIE SURFACE OVERLAY | AUK, BROUGHTON
Hollingsworth Bros UK Ltd was awarded the contract to resurface 4416m²of AUK taxiway, originally built in the 1940s, by means of overlaying. Read more
Hollingsworth Civils Case Studies
AIR TRAFFIC CONTROL DRAINAGE | AUK, BROUGHTON
The project required the installation of 800m 375mm dia concrete drainage pipework. The project had unique challenges concrete drainage pipework. Read more
Hollingsworth Ellery Case Studies
NEW FUEL FARM TO SERVE HAWARDEN AIRPORT
Hollingsworth Ellery were selected to provide a new Fuel farm as the previous facility was relocated due to the new Beluga Line Station for AUK Read more
BUILDING 53 AUK
This complex project involved the conversion of the old boiler house into a modern office facility to house the AUK site facilities department. Read more
GREAT BEAR NOTTINGHAM & SHEFFIELD
The project involved demolition of a substantial two Storey office including diversion of existing site services. The area abutting the main warehouse was then reinstated with brickwork and cladding and the hard paving in the building footprint reinstated with drainage and tarmac. Read more
JR WEBSTER
J R Webster, a well established specialist supplier to industry for fixings, tools and PPE, required a new warehouse and sales outlet in Liverpool. Read more
HENROB
As part of their future business strategy and expansion plans, Henrob purchased an existing industrial unit on Deeside Industrial Park. Read more
COPSE LANE SITE ENTRANCE
Hollingsworth Group were selected to deliver a new entrance to the AUK. Interfaces at the formation of the link to Chester road and working around the existing North Factory entrance were key issues. Read more
HANGER 251 PRODUCTION FACILITY | AUK, BROUGHTON
Hollingsworth Ellery were selected by AUK to carry out an emergency provision of a production facility for equipping wings.Read more
COMPOSITE TRAINING FACILITY | AUK, BROUGHTON
Hollingsworth Ellery were selected to carry out the high specification internal fit out works to an existing industrial unit within AUK. Read More
EAST WALL TOILETS | AUK, BROUGHTON
This project was the first of an AUK rolling program to upgrade amenity facilities. Read more
EXTENSION TO, & REFURBISHMENT OF, HANGAR 75 | AUK, BROUGHTON
Hollingsworth Ellery were selected to carry out the refurbishment of, and extension of this pre-war constructed Pentad hangar. Read more
LONG RANGE JIG REFURBISHMENT | AUK, BROUGHTON
Hollingsworth Ellery were selected to carry the refurbishment of five long range jigs which produce the wings for A340 aeroplane one of the cornerstones of the business. Read more
AUK NEW VISITORS RECEPTION | AUK, BROUGHTON
Hollingsworth Ellery were selected to negotiate the conversion of an existing building to provide a new visitor reception. Read more
OSS REFURBISHMENT | AUK, BROUGHTON
Hollingsworth Ellery were selected to carry this sensitive refurbishment of this live office area. . Read more
RECEPTION REMODELLING | RFD BEAUFORT, BIRKENHEAD
This project was the focus of a major upgrading of the RFD Beaufort site at Birkenhead. Read more
SURFACING TO SITE ROADS | GM MOTORS, ELLESMERE PORT
Hollingsworth Ellery were selected to carryout critical upgrades to GM Motors (Vauxhall) site infrastructure and external access roads and car parking upgrades. Read more
GREAT BEAR LINK 56 – SMART STAGE | SANDYCROFT, NORTH WALES
HHollingsworth Group were selected to adapt the rear delivery area of this distribution warehouse. Read more